Transportation System Plan Update
During the summer of 2024, while Lam's TUX land-use application was still pending, and while Lam was seeking to signalize the Tualatin Road / 115th Avenue intersection (red circle below) to use it as their primary employee entrance, the City of Tualatin initiated an update to the Tualatin Transportation System Plan (TSP).
During this TSP update, neighbors attended city workshops and identified a number of serious unintended consequences that would have resulted from the signalization of this intersection. The worst being that commuters using the already overloaded Tualatin Road (in green) to head north on Highway 99W (in red) would be able to easily and legally avoid the traffic signal congestion by cutting through the neighborhoods, using the pink and orange routes below. The community advocated relentlessly during this process for the removal of this traffic signal and for for the correct arterial classification of Tualtin Road to be restored. We also provided verbal testimony and public comment to the Tualatin Planing Commission in 2025.
As a result of these efforts, in the summer of 2025, the City changed the classification of Tualatin Road from a collector to an arterial, and City Council President Valerie Pratt proposed, and successfully accomplished, removing this problematic traffic signal from the funded projects list, so that the City can not signalize this intersection in the future without public engagement and a council vote.
During the TSP update we also proposed converting the Tualatin Road / Herman Road / Cheyenne Way intersection (below) to a roundabout in order to make Herman Road the easier, default route, and divert commuter cut-through traffic from taking Tualatin Road. This roundabout would also greatly improve safety and access for the residents of Cheyenne Way who currently must cross multiple lanes of traffic to exit their neighborhod. The roundabout proposal has received a positive response from staff and council, and we continue to advocate for this important upgrade until it is adopted and built.